EDGE Modern Contracting Company- KSA-Building

OSOOL Digital City #2

  • Location: Riyadh – KSA
  • Scope: MEP Contracting Works
  • Detailed Scope: Deployment of a specialized team to complete MEP Contracting works previously left unfinished and conducting the required Testing and repair to ensure operational systems.
  • Team Composition: 1 Project Director, 2Project Managers, 3 Construction Managers, 4 Senior Engineers, 10 Site & Quality Engineers, 24 Supervisors and 120 Technicians.
  • Duration: 4 months of intensive work. (October 2023 till January 2024)
  • Outcome path: 12,210 Number of Mechanical Testing + 39,269 Number of Electrical Testing; which resulted in Successfully conducting all necessary testing and repairs, achieving operational readiness within the project timeline.
EDGE Modern Contracting Company- KSA-Building-KAFD

King Abdullah Financial District KAFD

  • Location: Riyadh – KSA
  • Scope: MEP Contracting Works
  • Detailed Scope: Supply, Install and testing of 10 DX Units, 60 FCUs, 10 Air Separators, 8 Pressure Vessels, 10 Sump pumps, 2 GRP Tanks along with Electrical and Control Systems.
  • Team Composition: 1 Project Manager, 1 Construction Manager, 2 Senior Engineers, 2 Site & Quality Engineers, 2 Supervisors and 30 Technicians.
  • Duration: 3 months of intensive work. (Apr-Jun 2024)
  • Significance: This project highlights our technical capabilities and our ability to manage complex MEP installations in a prominent development.
EDGE Modern Contracting Company- KSA-Building- airport

Riyadh Metro Station – Iconic (1B3)

(Previous team experience)

  • Location: Riyadh – KSA
  • Area: 32,000 m2
  • Duration: 2018-2024 (Partially suspended due to Covid outbreak)
  • Brief Description: The execution of MEP work at the Iconic Metro Station, which features two intersecting stations, entails the proper installation, testing, and commissioning of all mechanical, electrical, and plumbing systems.
  • EDGE Staff Involvement: CEO, Engineering Manager, Construction Managers and Engineers
  • Detailed Scope: HVAC, Plumbing & Fire Fighting and Electrical
EDGE Modern Contracting Company- KSA-Building

SAB Head Quarters’ Tower

(Previous team experience)

  • Location: Riyadh – KSA
  • Area: 46,544 m2
  • Duration: 2018 – 2023
  • Brief Description: Tower consisting of 30 Floors above ground including Offices , Technical Rooms and Data Centers + 3 Basements + 8 floor retail Building + 8 Floor Parking Building + Landscape
  • EDGE Staff Involvement: CEO, Engineering Manager, Construction Managers & Engineers
  • Detailed Scope: HVAC, Plumbing & Fire Fighting, LV and MV
EDGE Modern Contracting Company- KSA-Building- hospital

Ministry of health – 5 Hospitals

(Previous team experience)

  • Location: All Over the Kingdom – KSA
  • Area: 75,000 m2
  • Project Value: 350,000,000 SAR
  • Brief Description: This project focuses on the rehabilitation of five typical hospitals, each consisting of four buildings: Main Building, an Ancillary Building, a Chiller Yard, and a Sewage Treatment Plant (STP) Building.
  • EDGE Staff Involvement:  CEO, Engineering Manager, Construction Managers & Engineers
  • Detailed Scope: HVAC, Plumbing & Fire Fighting, LV and MV
EDGE Modern Contracting Company- KSA-Building-STC Data center

STC Data Center

(Previous team experience)

  • Location: Riyadh – KSA
  • Area: 18,000 m2
  • Duration: 2011-2015
  • Brief Description: Turnkey Project TIER III Certificated. 18,000 m2 Project Area , 6000m2 IT Room Area , 1194 Racks.
  • EDGE Staff Involvement: Construction Managers & Engineers were managing big part of the MEP Works
  • Detailed Scope: HVAC, Plumbing & Fire Fighting and Electrical Works
EDGE Modern Contracting Company- KSA-Building

KAUST

(Previous team experience)

  • Location: Thuwal– Western Region – KSA
  • Area: 550,000 m2
  • Duration: 2008 – 2010
  • Brief Description: KAUST Project Included Administration Building 16 17, Auditorium Building 20, Service Building 17, Parking buildings 21, Chemical Warehouse Building 17.
  • EDGE Staff Involvement: CEO, Engineering Manager, Construction Managers and Engineers
  • Detailed Scope: HVAC, Plumbing & Fire Fighting and LV.
EDGE Modern Contracting Company- KSA-Building

Al Akaria Plaza

(Previous team experience)

  • Location: Riyadh – KSA
  • Area: 235,000 m2
  • Duration: 2006-2008
  • Brief Description: The MEP scope for Al Akaria Plaza 16 Floors  includes the shop drawing, installation, testing and commissioning of all mechanical, electrical, and plumbing systems to ensure optimal functionality and safety throughout the facility..
  • EDGE Staff Involvement: CEO, Engineering Manager, Construction Managers & Engineers
  • Detailed Scope: HVAC, Plumbing & Firefighting, LV and MV